Alice Anne 4

Here we laid a 12mm formica faced sole and fitted solid teak nosings on the front of the steps leading to the galley.

Materials used: 12mm Formica faced ply
Sikaflex 298 to bond the sole down (215 primer)
Solid teak for nosings on the steps.

Turnaround time to complete this project: 5 days







 

 

 

Back to Gallery Page


Solent ShipwrightsUnit GDeacons BoatyardBursledon BridgeSouthamptonHampshireS031 8AZ